Hi,
We now have AX 2012 R2 retail/POS running in about 50 stores but we're experiencing problems with the synch service meaning P-0001 jobs are are often failing.
The specific issue seems to be where one or two stores go offline or synch service fails then the P job also fails to pull through for all the subsequent stores in the sequence for the job. So if store 40 out of 50 fails for example then no transactions are pulled for the last 10 stores. Has anyone else experienced this and can offer any advice to rectify? We can accept one or two stores failing to update sometimes but it's not good for jobs to fail on-bulk.
Note we have all our stores grouped together under one distribution location list, so on the distribution schedule screen the job shows as running to one location called 'All stores' rather than to a list of 50 separate locations. Could that make any difference?
Thanks.