Hi All,
I want to confirm about budget control in Project Management module.
When I create 2 level of WBS, and I put budget amount in the higher level (level 1).
When I perform actual cost in the level 2 of WBS, can I set the budget control to check on the overall cost of summed up all child WBS transaction? Or budget control can only check on the amount which is entered in each WBS/Activity Number?
Regards,
M.H.