Hi, we are currently on AX 2009 sp1 with ru8 and have been asked to create a report for employee efficiency. They would like to make sure the employee's are utilizing their time correctly.
They need to know:
how is the employee performing against standard (efficiencies)
Is the employee working all day (productivity) on jobs?
For example; An employee could have met standard, let’s say a six (6) hour job performed in six (6) hours but then stands around for the last two (2). They are efficient but not productive.
I was thinking of comparing the ProdRouteTrans to jmgStampTrans\jmgStampJournalTrans (combined) but want to make sure I and using the tables correctly to meet their needs.
thanks,
Kevin