Hi all,
I’ve installed R3 CU9 in our standalone TEST server which has recent backup of LIVE. In TEST server EP, Retail Components, AOS, Client and DB are installed. I updated all components by help of CU9 installation guide and completed software check successfully. Currently functional testing is going on. After this, I need to move these changes to Production. As per Installation guide, either we can move models or restore the model store.
I would like to restore model store in downtime. I wanted to do this in following way,
1) Restore model store backup (of course, will take live backup and will stop AOS).
2) Full CIL (I think Full Compilation is not required since it’s already done in TEST and the same is mentioned in guide)
3) Synchronization of DB.
4) Install CU9 Binary updates on required servers (Like retail components, Client and etc.).
Can anyone please suggest me, is this correct way to do? Am I missing anything?
Thanks,