Did anybody has tried to solve the following planning issue:
1. Company has two production sites: Site A and Site 2
2. Company produces Product in the following way:
a) Operations 10 to 40 can be done either in Site A or in Site B - there is no limits where
b) Operations 50 to 70 can be done ONLY in Site A.
Of course Client expects that:
a) AX will plan Productions taking first free resources for operations 10 to 40 either from Site A or Site B
b) there is no rules talking that production started in Site B MUST be continued in Site B
In summary - production could be done for example in that way:
Op 10 Site B
Op 20 Site A
Op 30 Site A
Op 40 Site A
OP 50 - 70 Site B
I will be very glad for any ideas....
Witold Adamiak