Quantcast
Channel: Microsoft Dynamics AX Forum - Recent Threads
Viewing all articles
Browse latest Browse all 72043

Changing product consumption AX 2012 R-2 CU9

$
0
0

We have a product which we order and receive based on “pc” (piece) measurement unit. The product it self is a box with two bottles. When consuming this product, throe production order, we consume the box (as a piece), but we really need just to consume one bottle at the time.

With out of changing the product number (creating a new one), I would like to know how can I consume only one bottle at the time, so purchasing would not order a new product (box with two bottles), until we consume the second bottle.

I was looking at Product —> Unit Conversion —>Intra-class Conversations as a possible solution, but not sure if this would be a proper way. My thinking was to setup conversion for this product as a one piece = two bottles.

Would this be the correct way and if yes, would I be able to consume individual bottle on production order, or is there any other way to accomplish this? 

Thank you in advance for any information.


Viewing all articles
Browse latest Browse all 72043

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>