I have a WIP enquiry/issue that i'd like to run past everyone..
My BOM has 2 items. The first item is FORWARD flushed, and the second item is BACK flushed.
When i RELEASE my production order, there is not posting to the GL and the WIP Report (Production Control - Balance - Work in progress).
When i START my order, the system posts the F-flushed items to the GL WIP account, the WIP report shows nothing, except the labour/overhead.
When i release as finished [RAF] 80% of the order, the GL WIP account is reduced by the 80%, but the WIP report still shows only the labour/overhead.
When i END the order, the WIP report is cleared, and so is the GL WIP account.
I would expect to see the WIP balancing to the GL at all times.. ? Or am i missing something..?