Hi all
I have a resource group and 4 resources connected to this resource group. I run masterplan with a scheduling method "Job scheduling". The 4 resources are people and they can do the same work. When I run masterplan it seems that only one resource is loaded. Is it possible to get all the resources loaded?
Br Erik