Production Planning: Cost calculation of BOM

$
0
0

Dears

I have a problem in cost calculation of BOM

Item numberConfigurationSizeColorStyleAcutal stitchesQuantityPer seriesUnit
EMB-FAB-001MULTI HEAD1MTMULTI388506D00.501.00Pcs

When I entered above-highlighted quantity less than 0.5 it's not Calculate production cost

Item numberConfigurationSizeColorStyleQuantityPer seriesUnit
EMB-FAB-001MULTI HEAD1MTMULTI388506D0.401.00Pcs

When I run this BOM Calculation, Its show zero cost.

Price typeVersionNameSitePricePrice unitPrice chargesPrice quantityIncl. in unit priceUnitFrom date
CostPLAND COSTPLANNED COSTW-INBOUND0.001.000.001.00Nom8/28/2017

How can I get this price calculation cost? Is that any option that BOM calculation check with exact quantity figure. 