Quantcast
Viewing all articles
Browse latest Browse all 72043

AX 2012 Master planning 'Plan version cleanup' batch job

Running a Master scheduling batch job every night. The system is generating a 'Plan version cleanup' batch job, but I am getting Alerts and records in the Batch job log that I don't really need (recording successful end).

Is there any way to control the Alter and logging behaviour of this batch job?

(and by the way, what is it doing?)

Thanks

Tim

 


Viewing all articles
Browse latest Browse all 72043


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>